Letter to the Editor – Keep Music Room in the School Construction Bond
The reduced scope of the 2017 School Construction Bond has relegated the Multi-purpose/Music Room to the ‘Alternate’ category, in a re-prioritized list of projects for a new bid package. There is a serious possibility that the Multi-purpose/Music Room may be dropped. The School Board will open new bids for the revised scope of the 2017 … More Letter to the Editor – Keep Music Room in the School Construction Bond





